CalcStack — free, instant, no signup. The interactive calculator loads automatically.

Christmas Light Pricing

The first install pays for the lights. The rehang is nearly pure margin.

A 120-foot roofline at $5.50 a foot with a wreath and timer is a $760 job — and a two-person crew running 3 jobs a day for 45 working days turns that into a $102,600 season. This calculator prices the job, then prices the season, and shows why year-two rehangs are the business.

Why people use this

Installers use it to price the season: 120 ft at $5.50 is a $760 job, and 3 jobs a day for 45 days is a $102,600 six-week sprint.

How it works

  1. Measure the roofline in linear feet — the pricing unit of the whole industry.
  2. Set your first-year per-foot rate with commercial-grade lights included ($5–$8/ft typical).
  3. Add extras: wreaths, timers, tree wraps, ridge-line upgrades.
  4. Enter crew capacity — jobs per day — and the working days between Thanksgiving and Christmas.
  5. Read job price, season revenue, and the year-two rehang price that carries the margin.

Common questions

How much should I charge per foot for Christmas light installation?

The national band for professional install with commercial-grade LED, custom-cut cord, timers, and takedown included runs $5–$8 per linear foot for first-year installs, with $4–$5 for rehangs once you own the customer's stored lights. The first-year premium is not margin-grabbing — it covers the material (a 120-ft job carries $150–$250 of lights and cord) and the custom cutting. Never price against the big-box DIY kit; you are selling commercial C9s, exact-fit cord, a timer, takedown in January, and storage — a completely different product that happens to also be lights. Quote per foot, present as a flat job price.

Is a Christmas light installation business profitable?

The economics are extreme because the season is short and the product is leased: a single 2-person crew at 3 jobs a day grosses roughly $100,000 in 45 days at a $760 average ticket, with labor, insurance, and material as the only real costs. The killer feature is the rehang book — every customer you install this year is a $480–$600 nearly-pure-margin job next November, so year two doubles revenue without doubling marketing. The risks are real though: it is ladder work on frozen roofs (insurance is not optional), the season dies if weather closes December, and cash flow is back-loaded into 6 weeks. The operators who win book rehangs in October before the previous season's lights are even down.

How do I get customers for holiday light installation?

The channel that outperforms everything else is your existing customer base if you run any other home-service business — landscapers, pool services, and pressure washers dominate this niche because the truck, the ladders, the insurance, and the customer list already exist, and the season fills their dead quarter. From zero: yard signs on completed jobs (every install is a billboard in a neighborhood of identical rooflines), Nextdoor and local Facebook groups in September–October, and HOA boards — one HOA approval can be 40 identical jobs. Google Ads works but the CPC spikes in November; the operators printing money stopped buying leads by year three because the rehang book refills the calendar itself.

Browse all 500+ free calculators →