Slabs, footings, posts — ordered right the first time.
Concrete has a brutal property: you cannot pause mid-pour to buy more. Ordering short means a cold joint and a weakened slab; ordering long is money hardening in the truck. This calculator converts your dimensions to cubic yards for ready-mix orders and to exact bag counts for the mixer-in-a-wheelbarrow approach, so the pour finishes in one go.
A concrete pour cannot pause while you buy more — ordering short ruins the slab. People use this to size ready-mix orders and bag counts for patios, walkways, and footings, and to decide the bags-versus-truck question (the crossover is about one yard).
The crossover is around 1 cubic yard: that is 45 bags of 80 lb mix — hours of brutal mixing — versus a single truck delivery. Most pros say bags under a yard, truck over it, and always order 5–10% extra.
4 inches handles passenger cars on good soil; 5–6 inches is the common standard for durability, and 6+ with reinforcement for trucks or poor subgrade. Thickness is cheaper than replacement.
About 45 bags per cubic yard (27 cu ft ÷ 0.6 cu ft per bag). The 60 lb size takes about 60 bags. The calculator shows both counts for your exact slab.